Sidewalk Rehablilitation Program Phase 7
Repair of sidewalks at 47 locations throughout the City including, but not limited to, removal and replacement of concrete sidewalk, curb, gutter, and asphalt roadway, as-needed tree maintenance work such as root shaving and root pruning, and installation of two curb and gutter passthrough bulbouts.
Specifications
(click to expand/collapse)
Name | Size | ||
C23-09 Phase 7 - Specifications 2-22-2023 | 6.4 MB |