Lower Codornices Creek Restoration Project – Phase IV
The Project is located along the Codornices Creek corridor between 8th Street and 10th Street and is described as follows: Construction of a multi-use path along Codornices Creek between 8th Street and 10th Street which includes, but is not limited to, demolition of an existing path, traffic control, tree protection, installation of a concrete path, an asphalt path, a speed table, a bioretention basin, fencing, and guardrails, asphalt concrete paving, vegetation removal, and vegetation planting.
Specifications
(click to expand/collapse)
Name | Size | ||
2023.05.05 C23-26 Phase IV Appendix | 56.2 MB | ||
2023.05.05 C23-26 Phase IV Specs | 1.8 MB |