2022 Annual Paving Project
Work generally includes between two to four inches of HMA removal and replacement, full depth asphalt replacement and grading at intersections, curb ramp installations, striping and paint, and storm drain improvements at the intersection of Carmel Avenue and Washington Avenue.
Specifications
(click to expand/collapse)
Name | Size | ||
C22-43 2022 Annual Street Rehabiliation - Specifications (w Att) | 7.8 MB |